Separate names with a comma.
Hi Eric, It is a gen2 model.
Hi Eric, I am using 76 33ah lifepo4 cells. I purchased the cells used, as that's all my budget could stretch too, but i did buy over 120 of...
When the kit is turned on, the pis system will automatically turn on ev mode if the conditions are right to do so.
Hi Eric, I fitted a 2nd user older pis kit a few weeks ago, it's all working well sofar apart from one glitch with the kit / software. In ev mode...
Hi Jason, are all the old cells damaged, can any of them be recovered. The reason I ask is can you get to 70 cells in series and use a system...
Hi Jason, Sounds like a good plan. I don't know how much that is costing you, I wish you well with the project. Keep the converter cool and...
Or maybe another way, Use shushils bms from Germany, also use the original bms, use the original fol lvc cutoff, and use the new one for...
Hi Jason, your BMS should already be configured NOT to balance, so why not just use cell loggers like i did and use the cell log alarm system to...
Hi Jason, You may want to read up alittle on using the meanwell as a changer, they are really good reliable powerful things, but what I have...
although i am not using the enginer system anymore i am still using a plug in hybrid kit and 11 cell loggers as a battery monitoring system....
it hasnt got a voltage so to say, you have to supply one, its a logic type of output through a transistor inside the unit, the same type of logic...
Hi Jason, I contacted the pacific ev team about a year ago abouth using the bms system in my enginer kit for use in the UK where we run on 240v...
I think the charger is set to 58v but I'm not 100 percent on that. A charger that does cc/cv is great but your cells then need to be in perfect...
the enginer lvc point is set at 2.6v.
The dischrge curve is the same as the charge curve, once down to around the 3v area theres harly any energy left in the cell. With the enginer...
Hey, it is a PIS kit that i got off here form the USA. Also got a zivan charger frnt he staes too, difficult to get that kind of stuff in the uk....
I dont think itll make any difference asking the same on enginer forum, youll get the same answer as most o the expereienced users and installers...
Although I haven't seen other bms systems for the enginer kit, I have read that the pacific ev is a pretty much plug in and play system that works...
I have now sold the enginer kit, and got a pack with 76 cells in series, I will probably trim that back to cells once I have completed the...
try to protect the new pack by not overcharging them, and hopefully you will get good use out of them.