1. Attachments are working again! Check out this thread for more details and to report any other bugs.

Featured It will soon be a great time to take your EV for a road trip out West

Discussion in 'Prius, Hybrid, EV and Alt-Fuel News' started by pilotgrrl, Oct 4, 2017.

  1. pilotgrrl

    pilotgrrl Senior Member

    Joined:
    Jul 23, 2017
    891
    1,797
    0
    Location:
    Chicagoan in TX
    Vehicle:
    2016 Prius
    Model:
    Three
    Gov. Hickenlooper joins 6 western governors in committing to EV charging station build out on highways

    Western governors set sights on electric vehicle charging network spanning seven states

    Deal signed to ease EV range anxiety with fast-charge network along 11 Interstate highways


    Forget outfitting 2,000 miles of U.S. highways with electric vehicle charging stations. Why not go for 5,000?

    Gov. John Hickenlooper on Wednesday said he and the governors of six other Western states have a plan to create a network of fast-charge stations that will ease range anxiety among electric vehicle drivers traveling along major transportation corridors in the region.

    Eleven interstate highways — including Interstates 25, 70 and 76 in Colorado — were highlighted as initial target corridors in a network covering more than 5,000 road miles.

    “This is an investment. Not just an investment of the future, but an investment in the brand of the Mountain West,” Hickenlooper said. “It’s about making us a hub for clean-energy innovation.”

    The announcement, made during Hickenlooper’s welcome address to the National Governors Association’s Energy Innovation Summit in Denver, comes 10 months after he and the governors of Utah and Nevada agreed to build an EV charging network covering 2,000 miles of highway across the three states. Montana, Idaho, Wyoming and New Mexico are the other states taking part in the larger Regional Electric Vehicle West Plan.

    More than 20,000 electric and plug-in hybrid vehicles are already on the road in member states, according to a joint news release. As of June, 10,000 electric vehicles had been registered in Colorado. The state has the fourth highest rate of people switching from gas-powered to electric vehicles in the nation. It helps that as of Jan. 1, new buyers in the state qualify for a $5,000 tax credit.

    Major U.S. automakers are committed to growing EV numbers in the West and beyond. Ford CEO Jim Hackett told investors Tuesday the company will introduce 13 electrics or hybrids over the next five years, including a small electric SUV due in 2020. A day earlier, General Motors officials said the company expects to produce 20 electric or hydrogen fuel cell vehicles by 2023. Eventually, the company wants its entire product line to run on alternative fuels.

    “Really this is just a tipping point,” Hickenlooper said, pointing to advancements like Chevrolet achieving more than 235 miles of range on a single charge as steps that will lead to wider adoption of EV. “You put in these charging stations across the West and I think you really do end up with a different kind of future.”

    The REV West Plan outlines five actions member states will work together to:

    Coordinate station locations to maximize use and minimize inconsistency between charging infrastructure. Develop practices and procedures that will encourage more people to adopt electric vehicles, including addressing “range anxiety,” or the fear of running of out charge that is viewed as major barrier to getting people to give up traditional cars.

    Develop operating standards for charging stations.

    Look for ways to incorporate stations in planning and development processes, including through building codes and metering policies.

    Encourage automakers to stock a variety of electric vehicles in participating states.

    Collaborate on funding and finding opportunities for the network.

    The governor’s office has said no new funding will be sought to spur development of the network in Colorado. The most notable source of existing funding in the state comes from the $68.7 million Volkswagen diesel emissions scandal settlement.

    The Colorado Department of Public Health and Environment had committed to spend $10.3 million, or 15 percent, of the payout on zero-emissions charging stations over the next five years.

    It would take 50 to 60 new fast-charge stations electrify the key Colorado corridors. The stations would cost between $150,000 and $200,000 each, officials say. The state is expected to leverage the Volkswagen money to attract private investment to help develop the charging corridors.

    Denver officials recently unveiled plans to add 300 quick-charge stations around the city over the next two years, nearly tripling the number available now.

    No timeline for creating the multi-state network has been set. But Hickenlooper said the purpose of the plan is to spur quick development. And he expects some friendly competition.

    “Certainly, if Utah is building their stations faster than we are, I’m going to ask our people why,” he said.

    One issue member states will have to contend with is the lack of standardized EV charging technology. Tesla has installed 951 fast-charge stations that can be used only by Tesla vehicles. GM this week promised an increase in the number of electric fast-charging stations in the U.S., which now total 1,100 from companies and governments, pledging its system would not be “walled off” from EVs made by other manufacturers, The Associated Press reported.

    Hickenlooper said governments will have to pressure vendors to provide technology that is flexible and conforms with existing or emerging industry standards to ensure the stations aren’t obsolete three to five years down the road.


    Posted via the PriusChat mobile app.
     
    bisco likes this.
  2. bisco

    bisco cookie crumbler

    Joined:
    May 11, 2005
    110,184
    50,069
    0
    Location:
    boston
    Vehicle:
    2012 Prius Plug-in
    Model:
    Plug-in Base
    oh sure, he's got all that new marijuana revenue, and no place to put it.:p
     
  3. hill

    hill High Fiber Member

    Joined:
    Jun 23, 2005
    20,191
    8,360
    54
    Location:
    Montana & Nashville, TN
    Vehicle:
    2018 Chevy Volt
    Model:
    Premium
    According to the map below, either built out now, or by the end of this year, there are already ½ dozen links across the U.S. (East to West) for at least ONE of the EV charging formats . . . . .

    [​IMG]

    so, are the goveners going to add to SAE? CHAdeMO? supercharger? the new VW L3? or just the quick charge format of their choice?
    .
     
    #3 hill, Oct 4, 2017
    Last edited: Oct 5, 2017
    RCO likes this.
  4. hill

    hill High Fiber Member

    Joined:
    Jun 23, 2005
    20,191
    8,360
    54
    Location:
    Montana & Nashville, TN
    Vehicle:
    2018 Chevy Volt
    Model:
    Premium
    .
    double post
     
  5. markabele

    markabele owner of PiP, then Leaf, then Model 3

    Joined:
    Mar 27, 2012
    5,084
    1,782
    1
    Location:
    Nebraska
    Vehicle:
    2018 Tesla Model 3
    Model:
    N/A
    Love this. Another example of how everyone realizes that Tesla has done everything very well and they simply need to follow in their footsteps. More choices is never a bad thing.
     
  6. Trollbait

    Trollbait It's a D&D thing

    Joined:
    Feb 7, 2006
    22,455
    11,767
    0
    Location:
    eastern Pennsylvania
    Vehicle:
    Other Non-Hybrid
    There is also VW's community service funding.
    Most likely dual CCS and CHAdeMO chargers that are already available. I just hope they go faster than 50kW.